Project

Intensive Care Unit in Bristol

Intensive Care Unit in Bristol


Brief

The project included a refurbishment of the existing operational hospital which included installing 2 x single slide hermetically sealing automated glass doors with side screens, 1 x Automated pair F30 GRP hinged doors into existing ICU Dept and 1 x Bi parting hermetically sealing automated glass sliding doors. On enquiry we discovered that 2 existing Large wards were to be split into 2 areas by using fixed glazed screens and hermetic automated glass sliding doors. This will allow for maximum visibility for nursing staff. The doors needed to be easy to use, clean, hermetically sealed, and automatic if possible.


Solution

In partnership with a large Main Contractor based in Bristol, Dortek provided their range of Automated Hermetically Sealing Sliding Doors over fixed glazed side screens. Combination of high patient visibility without the need to open the door plus accurate clean air control between rooms makes this door the ideal solution in Hospital Intensive Care Units. Dortek were asked to replace the existing doors with a more functional and hygienic alternative to meet these goals.